Updated
Detailed design and supervision.
The building design serves the authorities. The detailed design serves the contractor. Polish law does not require the second one for a detached house, which is exactly why material decisions so often get made by the bricklayer.

Who it is for
- A client who already has a building design and is realising it is not enough to start.
- A client going to tender who wants comparable bids.
- Anyone who does not want details settled on site in a hurry.
What the documentation should contain
- Plans and sections at working scale, fully dimensioned.
- Wall elevations wherever the tile layout matters.
- Schedules of windows and doors with performance, not just dimensions.
- Details: eaves, parapet, terrace threshold, window-to-wall junction, plinth, balustrade.
- Engineering: structure with reinforcement, electrical, plumbing, ventilation, heating.
- Material specification and bill of quantities.
Architect’s site supervision
Being on site when someone has to decide what was meant, and making sure the house is not traded away piece by piece: a cheaper window here, a different flashing there, a change nobody thought through against the whole.
What the client gets out of it
Three things: comparable bids (contractors price the same thing), fewer changes along the way (every change on site costs many times what it costs on a drawing) and a house that looks like the design.