How we work.

From the first conversation to a complete set of drawings you can build from takes us about nine months. Throughout that time the project is led by one person, the same one you speak to at the first meeting. Below is the whole route, step by step, with what we do and what you do at each point.

Courtyard house: the garden from the pool side, designed by MOOMOO Architects
Courtyard house: 454.75 m² with sixty per cent of the plot left green. Visualisation.
StepWhat is producedHow long
1. Conversation about the plotan answer on what may be built on itone meeting
2. Brief and proposalroom list, scope, schedule, feea few days
3. Concept designmassing, plans, site layout, visualisationsabout 3 months
4. Building permit designdocumentation and permit applicationabout 3 months, authority time separate
5. Technical and detailed designstructure, services, detailsabout 3 months, often in parallel with the authority
6. Choosing a contractorcomparable bids on the same documentationdepends on the market
7. Architect’s site supervisiondecisions on sitethroughout construction

1. Conversation about the plot

We start with the plot, not the house. The same plot can be right for a 150 m² house and wrong for a 300 m² one, and what may be built on it follows from the local plan or a zoning decision. The first conversation costs nothing. Ideally it happens before the plot is bought: then from day one we know what will fit. More: what to check before buying a plot and plot capacity study.

2. House brief and proposal

We do not ask how many square metres the living room should have. We ask how you live, and the room list with areas follows from that. You can do it yourself before the meeting in the house brief calculator. On that basis you receive a proposal: scope, schedule and fee. Complete documentation for a 400–500 m² house costs PLN 110,000–200,000 with us; the range depends on how complex the plot and the house are.

3. Concept design

Massing, plans, site layout, the house’s relationship with the sun, the view and the neighbours. Several attempts, conversations, revisions. These are the most important three months of the whole process, because here a change costs hours of drawing. This is also where the decisions are made that cost nothing yet shape daily life: where the morning light enters the bedroom, where the laundry sits, whether the ground floor could one day be lived on without stairs. The stage ends with an approved concept.

4. Building permit design

Site development plan, architectural and building design, consultations with engineers and utilities, and the building permit application. Authorities and approvals are on our side. The authority’s time runs separately: by law it has 65 days to decide (how long a building permit takes).

5. Technical and detailed design

Structure, electrical, plumbing, ventilation and heating, working drawings and details: what the contractor actually builds from. This stage often runs in parallel with waiting for the permit, so nine months can be shorter than it looks on paper. What exactly it should contain: the full list.

6. Choosing a contractor

Complete detailed documentation gives you something a permit design cannot: comparable bids, because every contractor prices the same thing. We help you compare them and ask the questions clients usually do not ask.

7. Architect’s site supervision

Being on site when someone has to decide what was meant, and making sure the house is not traded away piece by piece. Site supervision and interior design are priced separately; for a house of this size both are usually worth it (what the architect does on site).

What is on our side and what is on yours

  • Ours: the design at every stage, approvals, the permit application, contact with authorities, engineers and the contractor.
  • Yours: the surveyor’s map for design purposes, ground investigation, utility connection conditions and administrative fees. Usually a few thousand to over ten thousand złoty, and we raise it at the first meeting.
  • Shared: decisions. A house of this size involves hundreds of them, and the project moves at the pace of the answers.

How payment works

In stages, after each one is accepted. We do not take the whole fee up front, and you never pay for something you have not yet seen.

What slows it down and what speeds it up

Most often it is a change of mind after the concept is approved: that sends the process back a whole stage. Also no local plan, a plot with a history and utility connections not yet agreed. Coming to us with the plot before buying it, and quick decisions, speed it up. Details: how long designing a residence takes.