MOOMOO

PLENAR

Part 10 ·

We place the plant room
at the centre of gravity
of the wet rooms.

Underground garage: a MOOMOO project
Underground garage, a MOOMOO projectvisualisation

We place the plant room at the centre of gravity of the wet rooms. That shortens the pipe runs by up to 44 per cent: in a model of a house with eight wet rooms, from two hundred and ten metres to a hundred and twenty.

The tenth part of the series on the plan study. This one is about building services: the thing that is still invisible in a building permit drawing and is nonetheless decided there.

How much water there is in a house

Wet rooms per hundred square metres of house
The smallest unit in the base3.1 per 100 m²
A typical houseabout 2 per 100 m²
The least dense house1.0 per 100 m²

Counted as bathrooms, lavatories, kitchen, utility room, back kitchen, plant room and the sauna area. In absolute terms three to twelve rooms per house.

Density rises as the house shrinks, and it is the only figure in the whole study that behaves that way. In a small unit the kitchen, the bathroom and the utility room stand next to each other because there is nowhere else. In a large house the same functions spread across two storeys and four wings, and each needs its own connection.

What sits above what

A soil stack is cheap when it is short and vertical. We checked, for two houses, what sits above what.

Wet room upstairsWhat is underneathDistance to the stack
Main bathrooma wardrobe3.1 m
Utility roomhall and garage4.2 m
Bathroomgarage7.5 m
Bathroomgarage4.4 m

One house, four wet rooms upstairs.

Seven and a half metres of horizontal drainage in the slab above a garage works and stays accessible for servicing, but it needs a fall along its whole length and acoustic insulation. For comparison, in the second house we checked, the utility room sits entirely above the kitchen and the children's bathroom half above the kitchen and dining room, so the stacks are short.

Two hundred and ten metres of pipe

In a model of a house with eight wet rooms we worked out the water run from the plant room to each of them, taken perpendicular to the walls, with an allowance for the storey and for the connections.

Length of the water run to a single room
Ground floor bathroom43.6 m
Sauna with a shower32.9 m
Kitchen31.8 m
Main bathroom28.0 m
Ground floor lavatory25.1 m
Utility room19.5 m
Children's bathroom15.9 m
Children's bathroom13.2 m

About 210 metres in total, an average of 26 per room. At a market rate of PLN 60–100 per running metre for cold, hot and circulation pipework together, that is on the order of PLN 13,000–21,000.

The longest run goes to a bathroom on the ground floor and measures forty-three metres, more than three times the shortest. Both rooms are in the same model and both are bathrooms. The only thing that makes the difference is where the plant room stands.

Where the plant room should be

A common position is the end of the garage wing, far from the kitchen and the bathrooms. It is chosen for a good reason: it takes no space from the living part, and the noise stays on the garage side.

Total length of water runs by position of the plant room
At the end of the garage wingabout 210 m
At the centre of gravity of the wet roomsabout 120 m

The centre of gravity falls around the hall and the circulation. Moving it shortens the runs by 44 per cent.

Forty-four per cent is not a difference in finish. It is ninety metres less pipe, fewer places where something can leak, and a shorter wait for hot water at every tap. In exchange it costs a few square metres in a better part of the house.

We are not claiming the plant room should always sit in the middle. We are claiming this is a decision with a consequence, which we calculate at plan stage.

What ninety metres less pipe gives you

A shorter route is not just cheaper material. Three things change at once, and all three are felt every day.

What changesWhy
Waiting time for hot waterwater standing in the pipe has to run out before the hot water arrives; with a circulation loop this becomes a continuous heat loss along the whole length instead
Number of jointsevery coupling and every elbow is a place where a leak can appear after years
Heat loss in the circulation loopit runs round the clock and loses heat in proportion to the length of the pipe

With pipes run in the floor slab and the screed there is also the fact that a repair means breaking up the finishes.

We did not calculate the bill for the circulation loop, because it would need data on the insulation and on how long the pump runs each day. But the direction is clear: it is an item that costs money every month for thirty years, it is set once, on the plan, and it cannot be changed later.

For comparison: in the part on the thirty-year cost all the energy came out at three to four per cent of the bill. Water and drainage in a single-family house usually cost fifteen to twenty-five thousand złoty, of the order of two square metres of house. The difference in where the plant room goes fits within that budget, but its consequences last longer, which is why we settle it on the plan.

Drainage, the other half of the bill

Water runs under pressure and can go anywhere. Drainage runs by gravity, so every horizontal length needs a fall, and that fall eats into the depth of the slab. In the same model, the horizontal runs from the wet rooms upstairs to the nearest stack come to thirty-four metres.

ItemHow muchRateOrder of cost
Water runs: cold, hot and circulationabout 210 mPLN 60–100 per mPLN 13,000–21,000
Drainage from the upper floor, within the slababout 34 mPLN 80–150 per mPLN 2,800–5,200
The whole water and drainage installation in a detached house——usually PLN 15,000–25,000

The drainage rate includes fittings, brackets and acoustic insulation. Market ranges from 2026, not a quotation for a particular project.

So the bill is small in the scale of a house, but a line which is cheap to build can be expensive to repair: a pipe in the slab above a garage is accessible, a pipe in the floor of a living room is not.

Height as a reservoir of air

Storey height has one more function that is easy to overlook, because it does not show on a drawing. Every centimetre of height is a reserve of air to breathe before the ventilation manages to change it.

Clear heightAir per square metre of floorWhat follows
2.50 m2.5 m³carbon dioxide in a closed bedroom rises fastest
2.90–3.00 m2.9–3.0 m³, that is 16–20 per cent morea slower rise, but also more volume to heat
3.50 m3.5 m³, that is 40 per cent morea clear reserve of air, but a longer reverberation and a higher bill

This is why the same 13 m² bedroom ends the night at a completely different concentration depending on how tall it is. We count that in the part on night, air and quiet.

This is the only place in the whole study where a tall storey comes out ahead on the running costs. Everywhere else it costs: more external wall, more volume to heat, longer stairs. Here it buys time before the air goes stale. But it only buys time, not a solution — with a supply of thirty cubic metres per person per hour, height stops mattering, because the concentration settles regardless of volume.

What these houses are heated by

The heat source is a decision taken early and visible on the site drawing rather than on the plan. In our base it breaks down like this:

SolutionIn how many housesWhat it drags onto the plan
Air source heat pumpfour housesan outdoor unit kept away from bedroom windows, a buffer and a cylinder in the plant room
Ground source heat pump with boreholesone housevertical boreholes on the plot, so an item on the site drawing, not in the house
Gas boilersa two-unit house, one in each unita flue, a gas cabinet and separate meters for both units
Mechanical ventilation with heat recoverya two-unit house, one in each unitthe unit itself and duct routes, that is the depth of the suspended ceiling
Electric vehicle chargersrequired in the garages of the two-unit housesupply capacity and room for a distribution board in the garage

Twenty units, of which several projects do not state a heat source in the documentation we measured.

Two houses have no sewer connection and manage with a biological treatment plant or a sealed tank. Two others have rainwater tanks. These are items that change the site balance and need ground reserved for them before the house takes its final position; we count them in the part on the plot.

What changes from 2030

The legal position in October 2026 is that the new technical conditions exist as a draft regulation, not as law. For eighteen months from the twentieth of September a client may choose the existing ones. But the direction is already written down, and it concerns building services more than anything else.

What is due to changeFrom what to whatWhat it means in practice
Heat source in new housesfrom 2030 no on-site carbon dioxide emissions from fossil fuelsa gas boiler stops being an option in a new house
Designing for solar energya new requirementthe roof plane and its orientation become an item in the design
Acoustic class AQ-0a new requirement for semi-detached, terraced and two-unit housesthe wall between dwellings designed as an acoustic separation

Draft regulation of August 2026, legal position on 2 October 2026. The regulation has not been issued; this is a direction, not an obligation.

The other changes in this draft, the ones that concern the volume and the rooms rather than the services, we set out in the part on a house over fifty years.

For a house designed today and built in two years’ time, this is not a distant matter. Five houses in our base already have a heat pump, and none of those designs was made to meet a regulation, only to meet the bill.

Sockets

Recommended number of sockets, German standard
Living room over 20 m²24 sockets
Kitchen15
Child's room11
Study10
Utility room8
Bathroom4

RAL-RG 678, the enhanced standard. The Polish standard sets out the minimum number of circuits rather than sockets.

For our houses that comes to between ninety and a hundred and fifty sockets, excluding the garage and the plant rooms. It is a number that surprises clients regularly, because sockets are something you think about at fit-out stage and set out at first fix.

What the building permit design does not settle yet

Some decisions about services are made only in the detailed design, but room for them has to be reserved much earlier. These are the ones we reserve room for on the plan.

WhatWhen it is decidedWhat it needs on the plan
Ventilation unit with heat recoveryconcept, because later it will not fit2–4 m² of room and duct routes in the floor slabs
Cooker hood ducted outside, not recirculatingdetailed designa duct above the hob to the elevation or over the roof; harder with an island
Radon protection of the ground-floor slabbuilding permit designnothing on the plan, but it cannot be added later
A lobby between the garage and the houseconcepta dressing room or vestibule, not a door straight into the hall
Electric car chargerbuilding permit designconnection capacity and a place for the distribution board; a typical home charger is 11 kW
Rainwater tanksite layouta place on the ground and the distances; 10 m³ is about five weeks of a family’s demand for non-drinking water

The first and the last item are decided before the building permit design. The rest fit into it or into the detailed design, provided the plan has left room for them.

The ventilation unit is a borderline case here and worth saying plainly. It costs thirty to eighty thousand złoty in a house of two hundred square metres or more, but added after the fact it costs many times more, or is impossible, because there is nowhere to run the ducts or to put the unit. This is not a decision about equipment. It is a decision about two to four square metres of the plan, taken in the first month.

How much water comes into the house

The average person in Poland uses about ninety-two litres of mains water a day. Part of that does not need drinking water at all: flushing the toilet and the washing machine come, by the calculations of installation manufacturers, to about twenty-one cubic metres per person a year.

Water per person per year
Total mains consumptionabout 33.6 m³
Of which uses that do not need drinking waterabout 21 m³

Ninety-two litres a day converted to a year. The split into drinking and non-drinking uses follows the calculations of rainwater system manufacturers.

So nearly two thirds of the water we pay for as drinking water goes to the toilet and the washing machine. That is the figure from which the conversation about a rainwater tank starts, and the roofs of our houses collect from forty-one to two hundred and twenty-two cubic metres a year. The balance, and what it depends on, we calculate in the part on the plot.

What this part does not show

  • We calculated water and drainage runs for two houses, because only those exist as native models with geometry that can be measured.
  • The runs are taken perpendicular to the walls, which is how an installation is designed, but a contractor may route them differently.
  • The rates per running metre are market rates from 2026. They are ranges, not a quotation.
  • The number of sockets is a conversion from a German standard, not a count from an electrical design.

What this means when designing

Settle the position of the plant room with the plan, not after it. Forty-four per cent of the pipe length is a difference no choice of material can recover.

Put wet rooms upstairs above wet rooms below. Where that is impossible, plan for a horizontal run in the slab with a fall and acoustic insulation from the start.

We isolate a washing machine above a kitchen from vibration. At slab stage that costs little.

Sources. RAL-RG 678, the German guideline on electrical installation provision. The Polish standard on installations in buildings. Market rates for water and drainage installations, 2026. House data: MOOMOO detached house plan study, final edition, October 2026, part 9.

Licence. The figures and charts in this part are released under CC BY 4.0. They may be quoted, adapted and used commercially, crediting MOOMOO Architects as the source. Photographs and visualisations are not covered by the licence.

The whole study in one file

A hundred and thirty-five pages, twenty houses and apartments, fourteen parts and a hundred and eighteen drawings. Everything this series was built from, in full. The file is in Polish; the drawings and tables read without it, and an English edition is in preparation.

135pages 20houses 14parts 118drawings

The data controller is MOOMOO GROUP s.c. Jakub Majewski, Łukasz Pastuszka, ul. Polskiej Organizacji Wojskowej 25/14, 90-248 Łódź, Poland. We will use the address to send the report and, with your consent, further materials. Details in the privacy policy.

Prefer to look first? The whole series is readable here, part by part, without signing up.

Compiled by: Łukasz Pastuszkaarchitect, co-founder, MOOMOO Architects

We will run the numbers
for your plot.

Let’s talk about your project